Water cooled panel and other water cooled equipment Water cooled system
The electric arc furnace offers an alternative method of bulk steel
making. Unlike the basic oxygen route, the electric arc furnace
does not use hot metal. It is charged with "cold" material which is
normally steel scrap - which would otherwise be unsightly and
environmentally damaging. Other forms of raw material are also
available.
Steel scrap is first tipped into the electric arc furnace from an
overhead crane. A lid is then swung into position over the electric
arc furnace. This lid contains three graphite electrodes which are
lowered into the electric arc furnace. An electric current is
passed through the electrodes to form an arc. The heat generated by
this arc melts the scrap.
During the melting process, other metals (ferro-alloys) are added
to the steel to give it the required chemical composition. Also
oxygen is blown in to the electric arc furnace to purify the steel.
After samples have been taken to check the chemical composition of
the steel, the electric arc furnace is tilted to allow the slag,
which is floating on the surface of the molten steel, to be poured
off. The electric arc furnace is then tilted in the other direction
and the molten steel poured into a ladle, where it either undergoes
secondary steelmaking or is transported to the caster.
The modern electric arc furnace typically makes upto 150 tonnes in
each melt, which takes around 90 minutes. Steel making with
electric arc furnace is also economical. Every tonne of electric
arc furnace steel uses about 7.4 GJ of energy compared with about
16.2 GJ for every tonne of BOS steel (7.4 GJ is still equal to the
power consumption of a town of 100,000 population).
◆ WATER-COOLED PANEL ROOF
No. | PRODUCTS | SHAPE | CAPACITY |
1 | Water-cooled roof | 1.Sector 2.Round | 5~150t |
2 | Center loop | 1.Triangle 2.Round | 5~150t |
3 | Water-cooled frame | 1.Polygon 2.Round | 30~150t |
4 | Filling hole | 1.Coil 2.Pipe-link | 30~150t |
5 | Roof elbows | 1.Round 2.Ellipse | 30~150t |
6 | Support loop | Pipe-link | 90~150t |
7 | Water-cooled bow panel | Pipe-link | 90t |
BEIJING SINO STEEL ENGINEERING & EQUIPMENT CO., LTD.
Beijing Sino Steel Engineering & Equipment Co., Ltd. is concentrating on developing of ferrous & non-ferrous making and Rolling technology, mainly.
As one of the most experienced Chinese suppliers of complete line and components for steel and non-ferrous industries, Beijing Sino Steel Engineering & Equipment Co., Ltd. is engaged in design, manufacturing, engineering and service activities on word-wide basis.
Overseas Partners (Office):
India, Indonesia, Malaysia, Thailand, Korea, Turkey, UAE, Qatar, Iran, Saudi Arabia, Kuwait, Germany, France, Canada, USA, Brazil, Etc.
MAIN SCOPE SUPPLY:
EPS Project Line:
EAF, LF, Continuous Casting Machine, Preheating Furnace, Hot Rolling Mill Line, Cold Rolling Line, Centrifugal Casting Line, Slitting Line,Cut-to-length Line, Cleaning Line, Pickling Line, Coating line, Levelling line, Billet grinding line ETC.
Components & Parts:
Mill stand, Coiler, Uncoiler, Gearbox, Leveller, Copper Mould Tube, Copper Mould Plate, Water Jacket, Water Cooled Cable, Forged Rolls, Casting Rolls, Roll Shell, Roll Core,Bearing, Universal Shaft, Lathe, ETC.